Coal-Fired Boiler Replacement

Danville State Hospital (AMERESCO) Danville, PA

Projects

Overview

 As part of a Guaranteed Energy Savings Agreement (GESA) between AMERESCO and the Commonwealth of Pennsylvania, two coal-fired boilers were installed at the hospital’s central steam plant. Rated at 10,000 and 20,000 lbs. per hour, respectively, they were intended to replace two existing boilers, which had reached the end of their useful lives. However, the new boilers were never put into continuous service due to perceived poor combustion performance and concerns related to their design and installation.

In an effort to bring the project to a successful conclusion, AMERESCO committed to remove the two new boilers and replace them with a new gas-fired boiler. Entech joined the project to assist AMERESCO with this portion of the project.

Solution Details

The project scope included all mechanical, electrical, plumbing and structural engineering design services for the removal and replacement of the new coal-fired boilers. This included design and construction documents for the new, 10,000 lbs. per hour, natural gas-fired water tube boiler.

The boiler was furnished with a burner that had a 5:1 turndown ratio to accommodate periods of low-loads at the hospital. Modifications were required to the boiler control system as well as the floor, roof, catwalks, and railings to support the new boiler. Entech also provided services during construction and as-built drawings.

 

Have a similar project? Let's talk about it! contact us

Highlights

10,000 lbs./hr. natural gas fired boiler

5:1 turndown ratio